Large plastic-wrapped energy storage container delivered by crane truck at an outdoor industrial site in Eswatini.

    ⚙️ Case

    ✓

    2024-10-24

500 kW / 1,075 kWh Battery Energy Storage for Reliable Hybrid Power at an Events & Conference Centre - Eswatini

Mbabane, Eswatini

Commissioned:2024-10-24

Client:Events & Conference Centre

  • 500 kW

    Battery Power

  • 1,075 kWh

    Battery Capacity

  • 500 kWp

    Solar PV Capacity

  • 68 dB(A)

    Maximum Operating Noise

  • Exterior view of a white Sunpal containerized battery energy storage system (BESS).
  • Exterior of a white Elecod containerized BESS showing the side access panel and designated maintenance door.

Project Overview

In late 2024, SUNPAL ESS deployed a 500 kW / 1,075 kWh high-voltage containerized battery energy storage system at an events and conference centre in Mbabane, Eswatini. The all-in-one 20-foot unit, featuring LFP cells, advanced BMS, fire suppression, and quiet operation below 68 dB(A), operates in both on-grid and off-grid modes.

Paired with a 500 kWp solar array, the system helps maintain business continuity during load shedding, mitigates cable-theft-related power disruptions, and helps reduce electricity costs through peak-demand management, supporting the venue's green energy goals.

Challenge & Solution

Challenges

  • Unreliable grid supply and load shedding could disrupt conferences and venue operations
  • Cable theft created additional risks of unexpected power interruptions
  • High peak demand increased electricity costs during periods of heavy facility operation
  • The venue required reliable backup power without excessive equipment noise

SUNPAL ESS Solutions

  • 500 kW / 1,075 kWh high-voltage BESS for reliable backup and energy shifting
  • On-grid and off-grid operation for flexible response to grid interruptions
  • 500 kWp solar PV integration to increase renewable energy utilization
  • Low-noise operation below 68 dB(A), suitable for an active conference venue

Key Technical Specifications

ParameterSpecification
Battery Power500 kW
Battery Capacity1,075 kWh
Battery ChemistryLFP
Battery System TypeHigh-Voltage Containerized BESS
Container Configuration20-foot All-in-One Unit
Operating ModeOn-Grid / Off-Grid
Solar PV Capacity500 kWp
BMSAdvanced Battery Management System
Fire ProtectionIntegrated Fire Suppression
Operating Noise<68 dB(A)

Project Timeline

SEP 2024 | System Delivery
The 20-foot BESS arrived at the Mbabane facility, ready for installation and integration with the site's existing electrical infrastructure.

OCT 2024 | Site Installation
SUNPAL ESS engineers completed equipment positioning, electrical connections, battery installation, and communication setup for the containerized storage system.

NOV 2024 | Solar & BESS Integration
The 500 kWp solar array was integrated with the 500 kW / 1,075 kWh BESS for coordinated renewable energy management.

NOV 2024 | System Testing
Engineers completed protection checks, BMS verification, operational testing, and on-grid/off-grid mode validation before final system handover.

DEC 2024 | Commissioned
The 500 kW / 1,075 kWh battery energy storage system was successfully commissioned and placed into operation at the Mbabane facility.

Feedback from Head

"We used to worry about power interruptions during events. Since the battery system was installed, we have been able to keep essential loads running when the grid goes down. The system has also been quiet enough for normal operations at the venue."

Project Information

  • Location:

    Mbabane, Eswatini

  • Application:

    C&I Solar + Storage / Backup Power

  • Battery Chemistry:

    LFP

  • System Type:

    High-Voltage Containerized BESS

  • Operating Mode:

    On-Grid / Off-Grid

  • Container Configuration:

    20-foot All-in-One Unit

  • Operating Noise:

    <68 dB(A)

  • Commissioned:

    Dec 2024