    ⚙️ Case

    ✓

    2025-04-17

200kW / 500kWh Solar + Energy Storage System for a Water Plant - Nigeria

Lagos, Nigeria

Commissioned:2025-04-17

Client:Nigerian Water Treatment Plant

  • 200 kW

    System Power

  • 500 kWh

    Battery Capacity

  • 25 Days

    Engineering, Assembly & Factory Testing

  • Plug-and-Play

    Containerized System Design

  • Side view of an open white energy storage container showing battery racks with orange cabling and control compartments.
  • Interior view of an open energy storage container showing vertical racks of battery modules with orange high-voltage cables.
  • White energy storage container with Sunpal branding and open side doors inside a manufacturing facility.

Project Overview

In April 2025, SUNPAL ESS was awarded the EPC contract for a commercial solar-plus-storage system at a newly established water plant in Nigeria. The facility required reliable, uninterrupted power to support critical operations amid unstable grid supply and high diesel costs.

The customized containerized solution, delivering 200 kW power output and 500 kWh of battery storage, was engineered, assembled, and factory-tested in approximately 25 days. The system was shipped and arrived on site in early July 2025 for final installation and commissioning, providing a rapid-deployment, plug-and-play energy solution tailored to the plant's needs.

Challenge & Solution

Challenges

  • Unstable grid supply threatened continuous water treatment operations.
  • High diesel costs increased the plant's daily operating expenses.
  • Critical pumps required reliable power with minimal interruptions.
  • Rapid deployment was needed for the newly established facility.

SUNPAL ESS Solutions

  • 200kW system ensures stable power for critical water operations.
  • 500kWh LiFePO₄ storage provides reliable backup during grid outages.
  • Intelligent EMS coordinates grid, solar, battery, and generator power.
  • Containerized design enables faster installation, deployment, and commissioning.

Key Technical Specifications

ParameterSpecification
System Power200 kW
Battery Capacity500 kWh
Battery ChemistryLiFePO₄
System TypeContainerized ESS
Energy ManagementIntelligent EMS
System ConfigurationSolar + Energy Storage

Project Timeline

MAY 2024 | Project Assessment & System Design
SUNPAL ESS's engineering team assessed the water treatment facility's operational requirements, load profile, and backup needs, followed by the development of the 200kW/500kWh containerized ESS solution.

JUL 2024 | Quotation & Contract Signing
The final system configuration and commercial proposal were confirmed based on the plant's requirements, followed by EPC contract signing for project execution.

SEP 2024 | Manufacturing & Factory Testing
The complete 200kW/500kWh system was manufactured, assembled, integrated, and factory-tested to verify key system functions and performance before shipment.

DEC 2024 | Shipping & Site Delivery
The containerized ESS was shipped to Nigeria and delivered to the water treatment facility, where it was prepared for final installation and electrical integration.

APR 2025 | Installation & Commissioning
The system was installed and electrically integrated with the facility, followed by system testing and guided commissioning to support reliable and continuous water treatment operations.

Circular headshot photo of a Project Manager against a grey background.

Feedback from Project Manager

"One of our main concerns was keeping the plant running without relying too heavily on diesel generators. SUNPAL ESS provided a well-integrated solution that reduced the amount of work required on site. The installation and commissioning went smoothly, and their engineering team provided good support throughout the process."

Project Information

  • Client:

    Nigerian Water Treatment Plant

  • Location:

    Lagos, Nigeria

  • Application:

    Commercial Water Treatment / Reliable Power Supply

  • System Power:

    200 kW

  • Battery Capacity:

    500 kWh

  • Battery Chemistry:

    LiFePO₄

  • System Type:

    Containerized Solar + Energy Storage System

  • Delivery Scope:

    EPC

  • Manufacturing & Factory Testing:

    25 days

  • Commissioned:

    Ari 2025