Project Overview
A commercial facility in Suriname sought to reduce its dependence on grid electricity and increase the use of renewable energy for daily operations. The project required a 100 kW grid-connected rooftop solar PV system paired with 50 kWh of battery storage, making use of the facility’s existing rooftop space for on-site energy generation.
SUNPAL ESS provided the complete technical solution, including system configuration, equipment selection, and implementation support. The system combines approximately 300 rooftop solar panels with a 50 kWh battery energy storage system, allowing the facility to store surplus solar power and increase on-site renewable energy utilization.
The project operates as a behind-the-meter solar-plus-storage system, with the generated electricity primarily serving the facility’s own load. By combining rooftop PV generation with battery storage, the system supports lower grid electricity consumption and greater energy independence for the facility.
Challenge & Solution
Challenges
- Heavy reliance on diesel generation increased operating costs and fuel consumption.
- Remote districts required more reliable and diversified electricity sources.
- Variable solar generation required stable integration with the existing grid.
- Strict EBS interconnection standards required compliant system design and control.
SUNPAL ESS Solutions
- 100 kW grid-connected PV generation reduces reliance on diesel-based electricity.
- 50 kWh battery storage improves solar utilization and supply flexibility.
- Cloud-based EMS coordinates solar generation, battery storage, and grid operation.
- Grid-compliant design ensures seamless integration with EBS distribution infrastructure.
Key Technical Specifications
| Parameter | Specification |
|---|---|
| PV Capacity | 100 kW |
| PV Panels | Approx. 300 Panels |
| Battery Capacity | 50 kWh |
| System Type | Grid-Connected Rooftop Solar PV + Battery Storage |
| Energy Management | Cloud-Based EMS |
| Grid Integration | Grid-Connected |
| Installation Type | Rooftop |
| Commissioned | September 2021 |
Project Timeline
JUL 2020 | Project Assessment
Project requirements, EBS distribution conditions, grid requirements, and site conditions were assessed, followed by the development of the 100kW PV and 50kWh battery storage solution.
SEP 2020 | Solution Confirmation
SUNPAL ESS finalized the system configuration and technical solution based on the client's electricity consumption, available rooftop space, and planned operating requirements.
JAN 2021 | Equipment Production & Testing
PV and battery equipment was manufactured, assembled, and tested according to the finalized system design, grid requirements, and planned installation conditions.
MAY 2021 | Shipping & Site Installation
The equipment was shipped to the project site and subsequently installed, electrically integrated, and connected to the grid. Project execution was extended due to COVID-related restrictions.
SEP 2021 | Commissioning
The 100 kW rooftop solar PV system and 50 kWh battery energy storage system underwent commissioning and functional verification, including PV generation, battery charging and discharging, grid-connected operation, and energy management functions.