Project Overview
A private commercial client operating a farm in Polo Industrial Ezeiza, Buenos Aires, required a hybrid solar + energy storage system to store excess solar generation, perform peak shaving, reduce demand charges, and ensure continuity during grid outages. Contracted power stood at 120 kW, with demand charges forming a major cost.
Our company delivered an 80 kW / 160 kWh hybrid solar + energy storage system featuring high conversion efficiency and hybrid liquid-air cooling. Fully integrated with the site’s PV arrays, the system was commissioned in December 2025. Results included demand reduction to 60 kW, approximately 90 % self-coverage, and up to 55 % energy cost savings.
Challenge & Solution
Challenges
- High electricity demand increases operating costs and grid dependence
- Variable solar generation creates challenges for consistent energy utilization
- Grid interruptions threaten critical operations and business continuity
- Multiple power sources require coordinated control and energy management
SUNPAL ESS Solutions
- 80kW hybrid system integrates PV generation with battery storage
- 160kWh LiFePO₄ storage enables reliable energy shifting and backup
- Hybrid inverter supports seamless grid-connected and backup operation
- Intelligent EMS optimizes PV, battery, grid, and load dispatch
Key Technical Specifications
| Parameter | Specification |
| Hybrid System Capacity | 80 kW |
| Battery Capacity | 160 kWh |
| Battery Chemistry | LiFePO₄ |
| Battery Configuration | High-Voltage LiFePO₄ Storage System |
| Operating Mode | Grid-Tied / Off-Grid |
| Energy Management | Intelligent EMS |
| System Application | Commercial Energy Storage / Hybrid Solar |
| Cooling Technology | Hybrid Liquid-Air Cooling |
Project Timeline
MAR 2025 | Project Assessment
SUNPAL ESS's engineering team reviewed the client's energy demand, operating profile, available installation conditions, and backup requirements to establish the initial system design.
MAY 2025 | System Design
The 80kW hybrid power architecture and 160kWh LiFePO₄ battery configuration were finalized, with PV generation, battery storage, inverter, EMS, and load management functions integrated into the system design.
AUG 2025 | Equipment Preparation
The hybrid inverter, battery storage system, control equipment, protection devices, and associated system components were prepared and tested before shipment to Argentina.
OCT 2025 | System Installation & Integration
The equipment was installed and connected to the site's electrical infrastructure, followed by integration of the PV, battery, inverter, grid, and critical loads.
NOV 2025 | Commissioned
The 80kW + 160kWh hybrid solar and energy storage system was successfully commissioned, enabling coordinated renewable energy utilization, energy shifting, and backup power operation for the commercial facility.